Live › incident › INC-github-f6yrxnz5f7bs
Go to dashboardNot triaged yet. The sources’ own description is below.
First seen by InfraStack 2026-10-23 19:12 UTC. All times on this page are UTC.
| Product | Ecosystem | Affected | Fixed in |
|---|---|---|---|
| GitHub | vendor | – | – |
Unknown from the sources.
Unknown from the sources.
Each row is the first time that source carried this signal. The analyst’s rows are its own findings.
On September 20, 2026, between 21:46 and 22:24 UTC the Pull Requests service was degraded and pull request merge and test-merge commits were created late, with delays reaching approximately four minutes at peak. Merge commits were delayed rather than lost. Because some Actions workflow runs start only after a pull request's merge commit is created, a subset of workflow runs for pull request events were also delayed. This was due to a routine repository maintenance job for an unusually large repository consuming nearly all of the memory on a single Git storage server, which left that server unable to serve the Git operations used to create merge commits. We mitigated the incident by removing the affected server from service at 22:18 UTC, after which the queued merge commits were created within six minutes. We have capped the memory a single repository maintenance job may consume so that one repository cannot exhaust a server, and we have improved monitoring and alerting on storage server health to reduce our time to detection and mitigation of issues like this one in the future.
This page as .md · .json · in your agent: get_signal("INC-github-f6yrxnz5f7bs")